Weatherproofing | Compliance & Testing F3V1 NCC

02 Sep 2024

Ensure your building projects meet the highest standards of weatherproofing compliance with our specialized testing services.

 

According to the National Construction Code (NCC) 2022, Part F3, Clause F3V1, roof and wall cladding must be designed and installed to prevent water penetration, which could lead to the deterioration of building elements (National Construction Code).

 

This critical clause underscores the need for effective weatherproofing to maintain the integrity and longevity of buildings.

 

At Azuma, we use a range of advanced techniques to ensure your constructions comply with Clause F3V1(4)(5):

 


 

–  Mock-Up Testing: Before large-scale construction, we conduct mock-up tests of the cladding system. This allows us to identify and address any potential issues in a controlled environment, ensuring that the final installation will perform effectively in real-world conditions.

 

–  Pressure Differential Testing: We create pressure differences between the inside and outside of the building to assess the cladding’s resistance to water penetration. This method helps us understand how the building envelope performs under various environmental pressures.

 

–  Water Penetration Testing: We simulate extreme weather conditions to assess the effectiveness of your cladding systems. Using calibrated spray racks and high-volume fans, we can mimic heavy rain and wind-driven water scenarios to identify potential leaks and vulnerabilities.

 

–  Sealant and Flashing Inspection: Proper installation of sealants and flashings is crucial for preventing water ingress. Our experts meticulously inspect these components to ensure they are correctly applied and intact, providing robust protection against water penetration.

 

–  Material Durability Analysis: We evaluate the materials used for cladding to ensure they meet the durability requirements specified in the NCC.

 


Weatherproofing testing in our Wind & Water testing rig – “The bigger rig”

The requirements of both subclauses in turn require specialized testing.

 

Sub-clause (4) specifies the test procedure for a direct fix cladding wall or a unique wall.

 

Sub-clause (5) Specifies the requirements for cavity wall construction, with the additional requirement of a water management test.

 

This is a necessity due to “cavity wall construction being designed to allow water to pass through the primary weather defense”, with the purpose of the cavity being to allow for the removal of any water.

 


F3V1(4) Contains three steps as set out in the NCC:

 

–  Apply a preconditioning loading to the external face of the wall, by placing 100% positive & 100% negative (suction) serviceability wind pressure to the external wall. The serviceability wind pressure will be determined by the location in which the wall is going to be installed.

 

–  Conduct a static pressure test at 30% of the serviceability wind pressure or 300 Pa, whichever is higher. F3V1(4)b refers to clause 8.6.2 of AS/NZS 4284 for the requirements of this test.

 

–  Apply cyclic pressure and test the water penetration in accordance with clause 8.6.2 of AS/NZS 4284

 

Table 1.1

 

 


F3V1(5) contains four steps with the first two remaining the same as F3V1(4):

 

–  Test three, the Cyclic pressure test, is slightly different to the cyclic pressure test specified in F3V1(4). The test is still required in accordance with 8.6.2 of AS/NZS 4284. However, instead of testing to three stages of serviceability – highlighted in table 1.1 above – F3V1(5) only requires one test. Only one cyclic pressure test is required as the water management test.

 

–  FV31(5)(d) contains additional testing requirements for a cavity wall. This test represents the failure of the primary weather defense or sealing. The primary weather defense includes the wall material, any flashings and sealing of joints and openings.

 


 

Like the test procedures highlighted above the compliance requirements are separated in two parts and are subject to the type of wall being tested.

 

F3V1(6)(a) specifies the compliance for a direct fix cladding wall and a unique wall. With compliance being met for these types of walls by no presence of water to the inside surface of the façade.

 

This includes the surface of the external wall, which is fixed to the internal wall, or for a single skin wall, the internal wall.

 

Regarding F3V1(6)(b) Cavity walls compliance is different in nature. Primarily due to the purpose and nature of cavity walls.

 

Water which passes through the primary weather defense will gradually be removed from the cavity either through weep holes or evaporation.

 

Compliance to the standard therefore allows water to enter the cavity provided water is not present on the removed surface of the cavity.

 

However, there are exemptions to this, as water may transfer to the removed surface through an isolated blemish due to the introduced defects.

 

Also, water can contact cavity surface such as battens. However, it must be demonstrated that the water can pass off/through these surfaces.

 

Partner with us to guarantee that your building projects are thoroughly tested and compliant with the NCC’s stringent weatherproofing standards.

 

Our comprehensive approach ensures that your roofs and walls will withstand the elements, protecting your investment and ensuring the safety and comfort of building occupants.

 

Contact us today to learn more about our services and how we can help you achieve excellence in construction.